3ae188f7-df55-45a9-9077-c28e90feec11.png.jpg
EDG

DELVINA FIELD – PETROLEUM OPERATIONS

  • Home
  • Cases
  • DELVINA FIELD – PETROLEUM OPERATIONS

edg

PETROLEUM OPERATIONS

DELVINA FIELD

1.D12 & D10 wells – Workover Operations

  • During 1Q-2Q 2021 workover operations took place in D12 and D10 wells.
  • The goals was to check the overall casing and the hole integrity, prior to start new operations in both wells.
  • Two sets of logging were run, mostly inside the casing.
  • The logging services has been provided by Bakerhughes and GTK Oil.
  • Albdrilling shpk workover rig has been secured for both wells.
  • Austral Integrated Services is providing workover supervision.
  1. D12 ST Drilling operations
  • Drilling operations took place during early 3Q, 2021, and are still underway.
  • The goal is to secure a new borehole into the reservoir section, which will be subject of a new completion and stimulation.
  • The logging service is provided by Bakerhughes and GTK Oil; mudlogging from Geolog;
  • Albdrilling shpk rig has been secured for drilling.
  • Austral Integrated Services is providing drilling and surveying supervision.
Contact EDG
EDG

© 2020 ENERGY DEVELOPMENT GROUP SH.A.